The plant features the most capable power testing facility in North America.
Test facility elements:
- 2.5 MW Utility Feed 60 Hz
- 2MW Diesel Engine Generator
- 4.5 MW Resistive Load Banks
- Harmonic Load Banks
- 400V, 480V, 3.3 kV, 4.16 kV, and 13.2kV (Future)
Test facility uses:
- Full Load and Voltage Systems Testing – Development or FAT
- Tests of Customer Equipment and/or Systems related to IEM Systems